Drop Head

Features
This component enables the early striking of the system allowing the Decking & the Infill Beams along with the plywood to be removed for re-use on upper levels in 3 to 4 days of concrete pour. Before, during and after the early striking the top plate of teh drop Head maintains contact with the concrete which can be left in position till the concrete is cured.
Features
This component enables the early striking of the system allowing the Decking & the Infill Beams along with the plywood to be removed for re-use on upper levels in 3 to 4 days of concrete pour. Before, during and after the early striking the top plate of teh drop Head maintains contact with the concrete which can be left in position till the concrete is cured.